Road fittings have reportedly been stolen from the newly inaugurated Second Niger Bridge.
POLITICS NIGERIA reports that a source in the Ministry of Works confirmed this development.
The source said that the expansion joint walkway on axis 330 of the bridge had been stolen. This newspaper learnt that this is a critical part of the bridge that helps to absorb expansion and contraction caused by changes in temperature.
The theft of the road fittings could pose a safety hazard to motorists. The damaged part can cause discomfort to motorists and could even lead to accidents.
The source said, “Unfortunately, It’s true. The stolen fitting is an element from the expansion joints of the bridge. Drivers on that road have to be careful as the damaged part can cause discomfort to motorists.”
The Second Niger Bridge was commissioned by former President Muhammadu Buhari in May 2023. It is a 1.6-kilometre long bridge that links Anambra and Delta states.
The bridge was built for N336 billion.
This newspaper reports that efforts to reach the ministry spokesperson for official confirmation were unsuccessful.
1 minute read